About ADG  
  News  
  Projects  
  Contacts  
  Home  
     

Airport Development Group's Success Stories



Worland Municipal Airport
Worland, Wyoming
Commercial Service Airport
CLIENT
CONTACT

Gary Thompson
Airport Manager
1438 Airport Road
Worland, WY 82401
307.347.8977

AIRPORT DEVELOPMENT GROUP
PROJECTS
2004 Shift and Extend Runway 16-34, Phase I. Relocate Highland Hanover Canal, Construct Irrigation Siphon, Relocate County Rd.

2003 Shift and Extend Runway 16-34, Phases I and II (Design Only), Acquire Land for Runway Extension.

2002 Environmental Assessment for Runway Relocation and Extension.

2002 Rehabilitate Aircraft Parking Apron.

1996 Reconstruct Runway Lighting and Taxiway Guidance Signs.

1995 Install VASI System for Runway 34.

1994 Seal Coat, Crack Seal, and Crack Repair on Taxiway A.
TOP  

Stennis International Airport
Bay St. Louis, Mississippi
General Aviation Airport
CLIENT
CONTACT

Bill Cotter
Director of Aviation
P.O. Box 2267
Bay St. Louis, MS 39521
228.467.7070

AIRPORT DEVELOPMENT GROUP
PROJECTS
2004 Widen and Strengthen Taxiway A.

2003 Air Traffic Control Tower Siting Study, Benefit Cost Ratio Preparation, and Contract Tower Program Application.

2003 Expand Main Aircraft Parking Apron, Overlay T-Hangar Taxiway, Rehabilitate Road A and Terminal Parking.

2002 Construct Blast Pad, Acquire Airport Regenerative Air Sweeper.

2001 Rehabilitate and Expand North Apron, Construct Taxiway “D”, Expand Airfield Lighting Vault, Install Backup Generator System, Install Wind Cones and REIL System.

2000 Reconstruct Taxiway Lighting System, Seal and Remark Runway 18-36, Runway Safety Area Grading.

1999 Construct Extension to Taxiway “A”, Airfield Signage.

1998 Airport Master Plan Study.
TOP  

Lawrence Municipal Airport
Lawrence, Kansas
General Aviation Airport
CLIENT
CONTACT

Debbie Van Saun
Assistant City Manager
6 East 6th
Lawrence, KS 66044
785.832.3402

AIRPORT DEVELOPMENT GROUP
PROJECTS
2004 Rehabilitate (Whitetop) Runway 1-19, Construct Connector Taxiway and Run Up Area.

2002 Extend Runway 15-33 298 Feet North and 400 Feet South, Extend Parallel Taxiway, Construct New Airfield Lighting Vault and Controls, Relocate MALSR, ASOS, and Glide Slope Systems, Construct New PAPI System (FAA).

2001 Rehabilitate Runway 15-33, Partial Reconstruction and Rehabilitation of Taxiway A, Rehabilitate and Expand Aircraft Parking Apron, Install Apron Floodlighting.

2000 Airport Layout Plan Update. Environmental Assessment for Runway Extension.

1997 Seal Coat And Crack Repair on Apron.

1994 Construct Fuel Farm.

1992 Safety Area Grading and Drainage, Construct Instrument Landing System (ILS) and Medium Intensity Approach Light System (MALSR).

1991 Acquire Land for Expansion and Instrument Landing System.

1990 Airport Master Plan.

American Concrete Paving Association regional award winner.
TOP  

Rock Springs-Sweetwater County Airport
Rock Springs, Wyoming
Primary Commercial Service Airport
CLIENT
CONTACT

Gary Valentine
Airport Manager
P.O. Box 1987
Rock Springs, Wyoming 82902
307.352.6880

AIRPORT DEVELOPMENT GROUP
PROJECTS
2004 Reconstruct Commercial Aircraft Parking Apron, Install Apron Floodlighting.

2003 Partially Reconstruct and Rehabilitate Taxiway A.

2002 Airport Master Plan.

2002 Rehabilitate and Partially Reconstruct Taxiways A, B, C, D, and E.

2001 Install Airfield Lighting Backup Generator, Replace Taxiway Lighting, Install Access Control Gates, Replace Apron Flood Lighting Control System.

2000 Acquire Snow Removal Equipment. Seal Coat and Remark Runway 9-27.

1999 Install Airport Landside Signage, Rehabilitate Auto Parking Lots and Access Roads.

1998 Construct Wildlife Fence, Safety Area Grading Improvements.

1997 Runway 9-27 Reconstruction, Phase Three.

1996 Runway 9-27 Reconstruction, Phase Two.

1995 Runway 9-27 Reconstruction, Phase One.

1994 General Aviation Apron Reconstruction. Runway Safety Area Improvements. Fuel Facility Improvements. Airfield Pavement Study.
American Concrete Paving Association national award winner.

1993 Airport Layout Plan Update. Manage & Administer Land Acquisition Program. PFC Application for Terminal Improvements. Terminal Roof Repair.

1992 Install New Taxiway Guidance Signs and Runway Distance Remaining Signs, Install Runway End Identifier Lights.
TOP  

Wendover Airport
Wendover, Utah
Primary Commercial Service Airport
CLIENT
CONTACT

Steve Perry
City of Wendover
100 S. 9th Street
Wendover, Utah 84083
435.665.2215

AIRPORT DEVELOPMENT GROUP
PROJECTS
2004 Runway Lighting Rehabilitation.

2002 Rehabilitate Runway 12-30, Seal and Remark Runway 8-26, Install Precision Approach Path Indicators and Runway Distance Remaining Signs, Expand Airfield Lighting Vault.

2001 Expand Aircraft Parking Apron, Install Precision Approach Path Indicator System.

1999 Construct New Primary Runway 8-26, Rehabilitate Taxiway A, Install Runway and Taxiway Lighting Systems, Precision Approach Path Indicators, and Runway End Identifier Lights.

1997 Construct Equipment Storage Building.

1996 Managed and Administered Land Acquisition Program.

1996 Airport Regenerative Air Sweeper and Index “B” ARFF Vehicle with Auxiliary Equipment Kit.

1995 Security Fencing With Electronic Access Control For Gates.

1994 Extend Runway 12-30 and Runway Lighting System, Install Precision Approach Path Indicator System, Rehabilitate Taxiway And Apron, Install Apron Flood Lighting.

1992 Rehabilitate Runway 12-30 and Taxiway A1, Construct Runway and Taxiway Lighting Systems and Airfield Lighting Vault, Install Precision Approach Path Indicator System.

1990 Airport Master Plan Study, (resulted in scheduled commercial service with DC-9s and MD-87s), FAR Part 139 Certification Assistance, Historical Structures Evaluation and Historic Property Management Plan.
TOP